Simons Voss Technologies Palm LDB Version 1.40 Manuel d'installation Page 201

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 318
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 200
VdS Shunt lock function 3066
Page 14
+
8
..16 V
Masse
+LED
- LED
C
NC
N0
SAB0
SAB0
SAB0
SAB0
2.4 Installing the Slave Activation Unit (SA)
Soldering terminal assignments:
1 Supply voltage positive pole
2 Supply voltage negative pole (ground)
3 + 4 Connection for LED (5 volts) in outside area
5 - 7 Not used
8 - 11 Sabotage contacts
12 Optional activation suppression when ground is applied
(for example, lock contact evaluation)
13 Deactivation acknowledgement (input)
14 Activation request to the master activation unit MA (output)
15 Ground (identical to soldering terminal 2)
29 Acoustic activation acknowledgement by BAC (not for DA)
30 Solder terminal for cable screen
Jumper settings:
Jumper connects right and middle contacts of B1:
Acoustic acknowledgement after activation release by activation unit
Jumper connects left and middle contacts of B1:
Acoustic acknowledgement after final activation is done by the BAC. The BAC
must draw pin 29 to ground (VdS-compliant configuration).
Vue de la page 200
1 2 ... 196 197 198 199 200 201 202 203 204 205 206 ... 317 318

Commentaires sur ces manuels

Pas de commentaire